Skip Ribbon Commands
Skip to main content

Public NAMA

:

My Application Page

NS-25 - Improvement of Energy Efficiency in the Jordanian Water Sector (IEE)

Jordan

NAMA Seeking Support for Preparation

  • A Overview
    • A.1Party
      A.2Title of Mitigation Action

      This field is limited by 200 characters.

      A.3Description of mitigation action

      This field is limited by 5000 characters.

      The Water Authority of Jordan is the largest electricity consumer in the country , using about 15% of Jordan's national energy production. The IEE programme is a sector wide programme to increase energy efficiency for water infrastructre with the objective to reduce the specific energy consumption per m3 of produced water targeting pumping facilities, wellfields, booster stations, the water supply network and other water infrastructure in the country. The IEE Programme is directly aiming at energy savings and GHG emission reduction in the different Governorate of the Kingdom together with the Jordanian Public Water companies and Keystakholders
      A.4Sector
      A.5Technology
      A.6Type of action
      A.7Greenhouse gases covered by the action
  • B National Implementing Entity
    • B.1.0Name
      B.1.1Contact Person 1
      B.1.2Address
      B.1.3Phone
      B.1.4Email
      B.1.5Contact Person 2
      B.1.6Address
      B.1.7Phone
      B.1.8Email
      B.1.9Contact Person 3
      B.1.10Address
      B.1.11Phone
      B.1.12Email
      B.1.13Comments

      This field is limited by 5000 characters.

      Add Additional Entity
  • C Expected timeframe for the preparation of the mitigation action
    • C.1Number of months for completion
  • D Currency
    • D.1Used Currency
      Conversion to USD: 1
  • E Cost
    • E.1.1Estimated full cost of preparation
      Conversion to USD: 211,864
      E.1.2Comments on full cost of preparation

      This field is limited by 5000 characters.

  • F Support required to prepare the mitigation action
    • F.1.1Amount of Financial support
      Conversion to USD: 0
      F.1.2Type of required Financial support
      F.1.3Comments on Financial support

      This field is limited by 5000 characters.

      F.2.1Amount of Technical support
      Conversion to USD: 211,864
      F.2.2Comments on Technical support

      This field is limited by 5000 characters.

      The amount requested for TA are required to finance a specialized and experienced consultant that will prepare the NAMA approach corresponding to the ongoing activities, also with the objective to find additional financial support for the mitigation action and potentially increase the funds available for investment under the Programme
      F.3.1Amount of capacity building support
      Conversion to USD: 141
      F.3.2Type of required capacity building support
      F.3.3Comments on Capacity Building support

      This field is limited by 5000 characters.

      TA measures should be accompanied by capacity building measures for MWI/WAJ in order to allow to Jordanian Institutions to prepare in the future NAMA measures independent from available grants of donors
  • G Relevant National Policies strategies, plans and programmes and/or other mitigation action
    • G.1Relevant National Policies

      This field is limited by 5000 characters.

      Water Strategy "Water for Life"; National Energy Strategy
      G.2Link to other NAMAs
  • H Attachments
  • I Support received
    • I.1Outside the Registry

      This field is limited by 5000 characters.

      I.2Within the Registry
      Support providedSupportTypeAmountCommentDate
      No records to display.
Download page as PDF file