- A Overview
- B National Implementing Entity
- C Expected timeframe for the implementation of the mitigation action
- D Currency
D.1 | Used Currency |
|
Conversion to USD: 1 |
|
- E Cost
E.1.1 | Estimated full cost of implementation | |
E.1.2 | Comments on full cost of implementation |
Equity: 176 MUSD / 136 MUSD Commercial credit: 978 MUSD / 318 MUSD ODA/IFI loans: 300 MUSD / 0 MUSD Climate finance: 575 MUSD / 75 MUSD Total finance: 2,029 MUSD / 529 MUSD Financial leverage of proposed climate finance: factor 4 / factor 7
|
E.2.1 | Estimated incremental cost of implementation | |
E.2.2 | Comments on estimated incremental cost of implementation |
|
- F Support required for the implementation the mitigation action
F.1.1 | Amount of Financial support | |
F.1.2 | Type of required Financial support | |
F.1.3 | Comments on Financial support |
MA1 BRT: Performance Guarantee Fund worth 55 MUSD MA2 Metro: Low-cost capital for infrastructure worth 500 MUSD MA3 LPG taxis: technical assistance worth 1 MUSD MA4 LCB: Low-carbon bus fund worthy 19 MUSD Total climate finance: 575 MUSD + 7 MUSD for Technical Assistance, i.e. Enabling Activities (EAs)
|
F.2.1 | Amount of Technological support | |
F.2.2 | Comments on Technological support |
|
F.3.1 | Amount of capacity building support | |
F.3.2 | Type of required capacity building support | |
F.3.3 | Comments on Capacity Building support |
NAMA Enabling Activities (EAs) are interventions that create necessary, favourable or conducive conditions for the uptake of the Mitigation Actions and, therefore, have an indirect impact on GHG emission reductions and SD benefits. They include the establishment of a NAMA Managing Entity which cooperates between stakeholders, supervises NAMA implementation and realizes the various Enabling Activities, the implementation of a NAMA MRV System including an urban GHG transport inventory, NAMA Policy Support, consisting in technical and policy advice, coordination and facilitation activities in areas such as integrated ticketing, modal integration, TDM and NMT and NAMA Capacity Building and Training.
|
- G Estimated emission reductions
- H Other indicators
H.1 | Other indicators of implementation |
|
- I Other relevant information
I.1 | Other relevant information including co-benefits for local sustainable development |
Other relevant information including co-benefits for local sustainable development Sustainable Development Impact 2017-2030 60 tons PM2.5 and 4,300 tons NOx avoided 5.0 billion USD saved in economic, social and environmental costs, including savings in time, fossil fuels, accident costs, and health related air pollution costs
|
- J Relevant National Policies strategies, plans and programmes and/or other mitigation action
J.1 | Relevant National Policies |
Mongolia’s Intended Nationally Determined Contribution
|
J.2 | Link to other NAMAs | |
- K Attachments
- L Support received
L.1 | Outside the Registry | |
L.2 | Within the Registry |
|
|
|